← Back to Warehouse Racking Project Cases
YONE INDUSTRIAL INSIGHTS

Peru Lima Regional Distribution Warehouse Pallet Racking Project

Peru Lima Regional Distribution Warehouse Pallet Racking Project

A 650 m² home-appliance distribution warehouse in Lima now holds around 800 pallet positions inside a 7 m clear height — with adjustable beam levels and every pallet directly reachable from the aisle.

650 m²
Warehouse area
7 m
Warehouse height
800
Pallet positions
2
Receiving / shipping zones

Project at a Glance

Location
Lima, Peru
Industry
Home appliances
Racking system
Pallet racking with adjustable beam levels
Layout
Separate receiving and shipping areas

The Challenge

At 650 m² with a 7 m ceiling, this Lima warehouse has very little floor to spare. It stores home appliances — heavy, large-format cartons whose sizes change from one product generation to the next, and which cannot be handled by block stacking alone.

  • A small footprint that has to carry a full distribution inventory.
  • Appliances arrive and leave as mixed SKUs, so each pallet must stay individually retrievable.
  • Inbound and outbound traffic sharing one working area, with no reserved room to add capacity later.

Our Solution

We installed pallet racking designed around a standard forklift aisle, with the layout split so that receiving and shipping each keep their own working zone.

  • Adjustable beam levels. Beam heights can be reset as appliance formats change, so the racking does not have to be rebuilt when the product mix does.
  • Direct access to every pallet. Every position is reachable from a standard forklift aisle — no pallet is blocked behind another.
  • Separate receiving and shipping areas. The two flows work independently, which also leaves room to extend storage capacity in the future.
  • Height used, floor saved. Storage builds upward through the 7 m height instead of consuming the small floor area.

Results

  • ≈800 pallet positions delivered inside a 650 m² building.
  • Every pallet individually accessible, which suits mixed-SKU appliance distribution.
  • Reconfigurable beam heights — the system adapts to new product sizes instead of locking the layout.
  • Clean inbound / outbound separation with reserved room for future capacity expansion.
Pallet racking installed in the Lima regional distribution warehouse

Delivery & Logistics

Design confirmation & production
Approx. 30–40 days
Sea freight
Approx. 25–30 days
Total lead time
Approx. 55–70 days
Delivery terms
CIF Port of Callao, Peru
Next step

Send us your carton sizes, pallet weights, clear height and floor plan. Our engineers will return a pallet racking layout with a confirmed pallet-position count and a CIF quotation.

Request a Quote
REQUEST A QUOTE

Need pricing for a similar project?

Send your rack type, load, dimensions and quantity and our B2B team will come back with a project-specific recommendation.