Colombia Bogotá Mezzanine Racking Storage Project

Colombia Bogotá Mezzanine Racking Storage Project

A 2,000 m² hardware warehouse in Bogotá gained a second storage level: a 1,200 m² mezzanine rack built over the existing ground-level shelving, lifting usable storage to about 2,400 m² without adding a single square metre of building.

2,000 m²
Warehouse footprint
1,200 m²
Mezzanine racking
2,400 m²
Total usable storage
8 m
Clear height

Project at a Glance

Location
Bogotá, Colombia
Industry
Hardware — wholesale and retail distribution
Cargo profile
Large number of small and medium-sized products, diverse SKUs
Racking system
Mezzanine racking over ground-level shelving

The Challenge

This is a high-SKU hardware operation built on small and medium-sized items, so storage has to stay accessible at item level rather than being palletised into blocks. The existing ground-level shelving worked — it simply stopped at eye height and left most of the 8 m building unused.

  • A very large number of small-item SKUs, handled in both wholesale and retail distribution.
  • Traditional floor-level shelving failing to use the warehouse's height.
  • Stock of different product types and turnover rates sharing one undifferentiated floor.

Our Solution

We added a mezzanine racking layer directly above the existing ground-level storage area, across roughly 1,200 m². Capacity grew upward inside the same footprint instead of requiring a larger building.

  • A second storage level. The mezzanine turns the unused height above the ground shelving into a full working floor of its own.
  • Two levels, separately managed. Upper and lower levels can each be zoned by product type and turnover rate, rather than mixed into a single picking floor.
  • Item-level access retained. Shelving stays shelving — small SKUs remain pickable by hand on both levels.
  • No building expansion. The 1,200 m² mezzanine roughly doubles usable storage to about 2,400 m² inside a 2,000 m² warehouse.

Results

  • ≈2,400 m² of usable storage from a 2,000 m² building.
  • The 8 m clear height put to work, where floor-level shelving had left it empty.
  • Clean SKU zoning — product types and turnover rates can be split across levels instead of competing for the same floor.
  • Wholesale and retail served from one warehouse, without expanding the footprint.
Mezzanine racking above ground-level shelving in the Bogotá hardware warehouse

Delivery & Logistics

Engineering design validation
Approx. 7–10 days
Production
Approx. 30–40 days
Sea freight
Approx. 35–45 days
Total lead time
Approx. 70–90 days
Delivery terms
CIF Port of Cartagena, Colombia
Next step

Send us your SKU profile, carton sizes, clear height and floor plan. Our engineers will return a mezzanine layout showing the usable area you gain on the second level, plus a CIF quotation.

Request a Quote
REQUEST A QUOTE

Need pricing for a similar project?

Send your rack type, load, dimensions and quantity and our B2B team will come back with a project-specific recommendation.